December 2, 2016
My Gold South Park Alabang w/ Erroll
- Install electrical wiring for the supply of power of showcases display.
- Inspect and list all materials needed
- Purchase materials at nearest Ace Hardware
- Layout and install plastic moldings (floor mounted)
- Layout wires (flat cord)
- Install switched outlets
- Testing
Nov. 24, 2016
My Gold SM DasmariƱas /w/ Erroll
- Install electrical wiring for the supply of power of showcases display.
- Inspect and list all materials needed
- Purchase materials at nearest Ace Hardware
- Layout and install plastic moldings (floor mounted)
- Layout wires (flat cord)
- Install switched outlets
- Testing
Nov. 22, 2016
Quiapo
- Pick-up/pullout wooden queen size deck and foam and deliver to Classica tower for unit 9A use as requested by Ms. Grace Serenas as per Mario of marketing dept.
Classica Tower
- Dis-assemble existing deck and re-assemble to unit 14G master bedroom
- Assemble newly delivered deck to unit 9A
- Made a call to information and request for a personnel to clean and de-clogged grease trap of unit 7F kitchen. See details here
- Contact contractor Roger Sapinoso for the full payment of repair unit 7F maid’s quarter CR leaking problems. See details here