Pages

Tuesday, November 29, 2016

2016



December 2, 2016

My Gold South Park Alabang w/ Erroll
  • Install electrical wiring for the supply of power of showcases display.
    • Inspect and list all materials needed
    • Purchase materials at nearest Ace Hardware
    • Layout and install plastic moldings (floor mounted)
    • Layout wires (flat cord)
    • Install switched outlets
    • Testing

Nov. 24, 2016

My Gold SM DasmariƱas /w/ Erroll
  • Install electrical wiring for the supply of power of showcases display.
    • Inspect and list all materials needed
    • Purchase materials at nearest Ace Hardware
    • Layout and install plastic moldings (floor mounted)
    • Layout wires (flat cord)
    • Install switched outlets
    • Testing

Nov. 22, 2016

Quiapo
  •  Pick-up/pullout wooden queen size deck and foam and deliver to Classica tower for unit 9A use as requested by Ms. Grace Serenas as per Mario of marketing dept.
Classica Tower
  • Dis-assemble existing deck and re-assemble to unit 14G master bedroom
  •  Assemble newly delivered deck to unit 9A
  •  Made a call to information and request for a personnel to clean and de-clogged grease trap of unit 7F kitchen. See details here
  •  Contact contractor Roger Sapinoso for the full payment of repair unit 7F maid’s quarter CR leaking problems. See details here

No comments:

Post a Comment